Thursday, March 3, 2011

Tunnel Layout




Chad is helping me out with finding the aesthetic centerline of the tank. Then transferring it to the bottom to layout the tunnel and mounts pockets. A lot trickier than it sounds. The stamped, then hand formed tank halves are anything but identical, so the conventional ruler layout method won't work. I was working on cutting the tunnel down to final height. Fab Kevin hooked me up with this piece. 13ga, cold rolled steel. Strong, precise and great to work with.

No comments:

Post a Comment