skip to main
|
skip to sidebar
25 DESIGN & ENGINEERING
Tuesday, March 15, 2011
Petrol Vessel
Tank, in it's finally resting place. Aligned it solely by sight, then sat on the floor, ran the TIG pedal with the back of my leg and tacked it into place.
Tacky Tank Tabs
Maybe I can get a job someday doing this welding stuff.
Tack it up, then double check it still fits.
Filler Panel
Holy shit, it is really a closed gas tank again. Was starting to wonder how many hours you can actually work on just one part of a motorcycle.
Ground Smooth
Ready for a skim coat of filler. Happy with how it came out. Every part was a huge lesson in metalworking.
Newer Posts
Older Posts
Home
Subscribe to:
Posts (Atom)
Blog Archive
►
2012
(3)
►
04/01 - 04/08
(1)
►
02/19 - 02/26
(2)
▼
2011
(21)
►
08/21 - 08/28
(1)
►
04/10 - 04/17
(3)
►
03/20 - 03/27
(3)
▼
03/13 - 03/20
(4)
Petrol Vessel
Tacky Tank Tabs
Filler Panel
Ground Smooth
►
03/06 - 03/13
(3)
►
02/27 - 03/06
(7)
►
2010
(3)
►
09/05 - 09/12
(3)
►
2009
(26)
►
08/30 - 09/06
(3)
►
08/16 - 08/23
(3)
►
07/19 - 07/26
(1)
►
05/10 - 05/17
(1)
►
04/05 - 04/12
(6)
►
03/29 - 04/05
(2)
►
03/15 - 03/22
(5)
►
03/08 - 03/15
(5)
About Me
ATF
View my complete profile